Following the failure of the old central heating system boiler in the week before Christmas 2004, emergency space heaters were used for a few weeks until a replacement boiler was obtained. This disaster steeled the minds of Church Members and the outcome was to accelerate plans of work to refurbish the church interior.

Photos on this page are supplied by Brian Buckley
Church Interior View

In November 2005, work commenced on the refurbishment, which was done in stages as follows:

  1. The side pews were removed to allow for the intallation of new, more efficient central heating radiators.
  2. Fifty new chairs were purchased from donations received and these were placed on bare floor boards in the space previously occupied by the side pews.
  3. New floor boards & joists were purchased to raise the level of the aisles to the same level as the pews. After leaving the timber to aclimatise for a few weeks in the church, joinery work was undertaken by church members under the leadership of Harold Critchley.
  4. A period of fundraising ensued to acquire a further 70 chairs, with many Members making generous donations and when this was achieved, the central pews were finally removed in the spring of 2007 and replaced with these chairs.
  5. Following other generous donations, a new carpet was laid in that summer.
  6. A dedication service was held on 23 rd September 2007 to commemorate this refurbishment.